Digital asset mining

Hosting for digital asset mining, built on industrial power.

ASIC fleets run on contracted power in energised facilities, with cooling, network and operations handled on site. One agreement, one point of contact, and you keep the hardware.

Total capacity
29MW
Active projects
3
Minimum deployment
250kW
On-site operations
24/7
What you get

Every layer under the hardware

We hold the whole stack so the only thing you run is the machine on top.

Power

Contracted and energised before hardware arrives

Industrial capacity on grid as the rule. Load is balanced across feeds and power work is coordinated with the customers it affects.

Cooling

Air-cooled containers as standard

Containers are the unit of capacity. Where density calls for it, the containers are hydro cooled.

Connectivity

Fibre with a second path

Fibre to the facility with a wireless backup, so a single cut does not take the fleet offline.

Operations

A team on site, 24/7

Technicians on shift around the clock with documented runbooks, monitoring, reporting and remote hands within four hours.

One agreement covers the site, the power and the operations.

Operating model Northwatt Colocation
Operating modelNorthwatt Colocation
Site
Industrial facilities built for continuous load
Power
Contracted and energised before hardware arrives
Operations
A team on site around the clock, working to written runbooks
The term

What digital asset mining hosting means

Digital asset mining is the industry's name for running the machines that secure proof-of-work networks, Bitcoin above all. Hosting is the service that puts those machines into a facility built for them.

The machines are ASICs: purpose-built, dense, power-hungry and sensitive to heat and dust. They need industrial electricity at a stable price, airflow or liquid cooling sized for their draw, a network path that does not drop, and people who can reach a rack at three in the morning.

A service agreement moves all of that onto the operator. The customer owns the hardware, the firmware and the pool configuration, and pays a rate for the power and the operations around it. The operator secures the site, contracts the energy, builds the distribution and cooling, installs the machines and keeps them running.

Who it is for

Fleets that want to run, not build

Fleet owners

Operators with machines on order or already running elsewhere who need energised capacity with a short path to power on.

Funds and treasuries

Owners of mining hardware as an asset who want it run to a written standard, with reporting they can show to their own stakeholders.

Resellers and sub-hosts

Companies that sell hosting to their own customers and need a facility partner behind the agreement.

Operators relocating

Fleets leaving a site because of rising power prices or curtailment they cannot control.

Go deeper

The offer, page by page

Questions

Digital asset mining hosting FAQ

Question not listed?

Send it through the form. Every message is read and answered by an operator.

Talk to Sales

A service that places your mining hardware in a facility with industrial power, cooling, network and staff, and runs it for a rate. You keep ownership of the machines and the rewards they earn.

We host ASIC fleets for Bitcoin workloads. Talk to us about your models and power profile.

No. You own the hardware and control its pool. We provide the facility and the operations around it.

We start at 250 kW. Below that the deployment rarely justifies the setup on either side.

Capacity is energised across multiple industrial facilities. We share facility specifics under a mutual non-disclosure agreement.

Send the hardware model, the quantity, the load in kW or MW and when you want to go live through the quote form. Every message is read and answered by an operator.

Get in touch

Let's talk capacity.

Tell us your hardware and your timeline. We will tell you where it can run.