ASIC hosting and colocation at industrial scale.
Colocation for ASIC fleets on industrial sites. Power, cooling, networking and remote hands are covered. You run the hardware.
From first contact to live operations
Six steps from the first message to live operations. Most fleets move from intake to power on within weeks.
Initial contact
Tell us what you are deploying. Hardware type, power needs and timeline.
Sizing and quote
We check the fit against energised capacity and send a written quote.
Site tour
Visit the facility. We review the electrical and cooling fit for your fleet.
Verification and service order
Company and identity verification, then the service agreement and service order. We allocate capacity and set the deployment schedule.
Hardware intake
Ship to the receiving address named in the service order. We handle receiving and inspection before install.
Commissioning
Physical install and power on. Network configuration and live operations.
You run the hardware. Everything under it is arranged for you.
- Site
- Industrial facilities built for continuous load
- Power
- Contracted and energised before hardware arrives
- Infrastructure
- Distribution, cooling and networking built for density
- Operations
- A team on site around the clock
Full-stack hosting for customer-owned fleets
Your hardware is handled by an experienced operations team. Intake through decommissioning.
Power and cooling
Energised industrial capacity with distribution and cooling built for density. Continuous load balancing across feeds.
Networking
Resilient connectivity and structured cabling. Network configuration and commissioning at power on.
Remote and smart hands
On-site technicians around the clock. Reboots, swaps, cabling and diagnostics. Response within four hours of a request.
Hardware logistics
Receiving, inventory and dock management for incoming hardware. Pre-deployment inspection before install.
Monitoring and reporting
Real-time telemetry on power draw and temperature. Alerting on threshold breaches. Monthly reports and a customer dashboard.
Decommissioning and returns
Structured decommissioning with secure data handling. Hardware removal and return shipment logistics.
Operations as a discipline
ASIC hardware runs at the edge of its thermal envelope. Continuous operations are the baseline, not the goal.
On-site team
Technicians on site with documented runbooks. Coverage spans power, cooling and network events.
You see what we see
Live dashboards for power and environment. Monthly written reports and incident notifications.
Change management
Documented procedures for infrastructure changes. Risk assessment and rollback planning for work that could affect your operations.
What we commit to, and how it is evidenced
| Item | Commitment | Evidence |
|---|---|---|
| Operating coverage | On-site team, 24/7 | Shift roster and runbooks |
| Monitoring | Real-time power and temperature | Customer dashboard |
| Alerting | On threshold breaches | Notification by email |
| Reporting cadence | Monthly written report | Delivered by email |
| Remote hands response | Within 4 hours | Service agreement |
| Minimum deployment | From 250 kW | Service order |
| Hardware intake | Receiving, inventory and pre-deployment inspection | Intake record per unit |
| Change management | Risk assessment and rollback plan | Change record per change |
| Incident notification | Same business day | Notification policy |
| Decommissioning | Secure data handling and return shipment | Decommissioning record |
| Contract term | 12 months minimum | Service agreement |
Hosting FAQ
Question not listed?
Send it through the form. Every message is read and answered by an operator.
Talk to SalesWe host ASIC fleets for Bitcoin workloads. Talk to us about your models and power profile.
No. The hardware stays yours. We provide the power and the operations.
Most fleets move from intake to power on within weeks, because the capacity is already energised.
Power, cooling, networking and remote hands, plus monitoring and reporting. Intake through decommissioning.
Capacity is energised across multiple industrial facilities. Locations are shared under a mutual non-disclosure agreement.
We start at 250 kW. Below that the deployment rarely justifies the setup on either side. Talk to us about your size and timeline.
Hosting with Northwatt, or building it yourself
| With Northwatt | On your own | |
|---|---|---|
| Time to deploy | Weeks into energised capacity | Site, grid connection and build first |
| Power | Secured and managed by us | You negotiate and manage it |
| Up-front capital | Hardware only | Hardware plus site and buildout |
| Operations | On-site team around the clock | You staff and run it |
| Best for | Fleets that want to run, not build | Owning the whole stack |
Let's talk capacity.
Tell us your hardware and your timeline. We will tell you where it can run.