Answers before the first call.
The questions fleet owners ask most, answered with what is confirmed. Anything that depends on your load, your hardware or your term is answered in the quote.
Hosting and colocation
Question not listed?
Send it through the form. Every message is read and answered by an operator.
Talk to SalesWe host ASIC fleets for Bitcoin workloads. Air-cooled models run in our standard containers, hydro-cooled models where density calls for it. Talk to us about your models and power profile.
No. The hardware stays yours. We provide the power and the operations.
Power, cooling, networking and remote hands plus monitoring and reporting, from intake to decommissioning. What sits in the base rate and what is billed separately is named in the service order.
We start at 250 kW. Below that the deployment rarely justifies the setup on either side.
Twelve months. The term, the notice periods and the exit are written into the service agreement.
Most fleets move from intake to power on within weeks, because the capacity is already energised.
Capacity is energised across multiple industrial facilities. We share facility specifics under a mutual non-disclosure agreement.
No. You own the hardware, control its pool and receive the rewards. We run the facility around it.
Rates and quotes
The rate depends on the load, the term and the hardware. Send the model, the quantity and the load in kW or MW through the quote form and we come back with a figure.
Energy, the charges for delivering it, taxes and levies, and the operations around the machines. What sits in the base rate and what is billed separately is written into the service order.
Whether and how the rate moves with the energy price is written into the service agreement. Ask for the indexation clause before you compare offers.
Security terms are part of the service agreement and named in the quote.
Machines, cooling and intake
Yes. The machines can come from the manufacturer, a distributor or the secondary market. Every unit is received and inspected before install.
Yes. Every unit goes through receiving and inspection before install, and the intake record names its condition.
Yes, where density calls for it. Hydro containers are confirmed per order, because they depend on the facility's loop capacity.
That is confirmed per order and depends on the facility. Send the model and quantity and we tell you what fits.
Yes, within the same cooling type. Air-cooled and hydro-cooled machines go into different containers.
Warranty handling with the manufacturer stays with you. Our team provides the diagnostics and the hands on site.
Running the fleet
Technicians work shifts on site around the clock, with documented runbooks for power, cooling and network events. Remote hands respond within four hours of a request.
Real-time telemetry on power draw and temperature with alerting on threshold breaches, a customer dashboard, monthly written reports and incident notifications.
Pool and worker configuration stays with the customer. Firmware changes and over- or underclocking follow the procedure in the service agreement and need written approval. Our team only touches a machine on your instruction or during an agreed procedure.
Registered customers reach the NOC around the clock through the contact named in their service agreement.
Structured decommissioning: secure data handling, hardware removal and return shipment to the address you name, recorded unit by unit.
Land and power for compute
No. The partner brings and operates the compute hardware. We provide the land, the power and the infrastructure.
No. We are the physical and energy foundation. The compute and the workload sit with the partner.
From colocation for a single deployment to powered land for large buildouts. We match the structure to your load.
Yes. Capacity grows in blocks as your requirement grows.
Let's talk capacity.
Tell us your hardware and your timeline. We will tell you where it can run.