Hardware

Hardware we host.

ASIC miners for Bitcoin workloads, from the major manufacturers and any source. Air-cooled models run in our standard containers, hydro-cooled models where density calls for it.

Families

By manufacturer

Three manufacturers make nearly every machine in the fleets we host. Each page lists the model series and how we cool them.

Cooling

Air, hydro and immersion

The cooling type decides which container a machine goes into. It is the first thing we check when a model list arrives.

Air cooled

The standard

Fans on the machine, containers with filtered airflow sized for the draw. The rule at every Northwatt facility.

Hydro cooled

Where density calls for it

Water plates instead of fans, a cooling loop in the container. Denser, quieter, and dependent on the facility's loop capacity.

Immersion

To be confirmed

Machines submerged in dielectric fluid. Whether and where we take immersion hardware is confirmed per order.

Before intake

What we need from you

Four things make the first answer quick and the intake clean.

Model and variant

The exact model name, including the cooling variant and the firmware you run.

Quantity and load

Number of units and the total load in kW or MW, so capacity and container type can be matched.

Condition and origin

New, used or refurbished, and where the hardware is today. Every unit is inspected on arrival either way.

Timeline

When the machines can ship and when you want them hashing.

Questions

Hardware FAQ

Question not listed?

Send it through the form. Every message is read and answered by an operator.

Talk to Sales

Yes. The machines can come from the manufacturer, a distributor or the secondary market. Every unit is received and inspected before install.

No. The hardware stays yours. We provide the power and the operations.

Yes, within the same cooling type. Air-cooled and hydro-cooled machines go into different containers.

That is confirmed per order and depends on the facility. Send the model and quantity and we tell you what fits.

Firmware changes and over- or underclocking follow the procedure in your service agreement and need written approval. Warranty handling with the manufacturer stays with you too; our team provides the diagnostics and the hands on site.

Get in touch

Let's talk capacity.

Tell us your hardware and your timeline. We will tell you where it can run.