AI Partnerships

Land, power and infrastructure for AI compute.

You bring and operate the compute. We provide the land, the power and the infrastructure it runs on.

Total capacity
29MW
Active projects
3
On-site operations
24/7
Who does what

What each side brings

Northwatt provides

  • Land and secured power
  • Industrial buildout and cooling
  • Networking and physical security
  • On-site operations around the clock

The partner provides

  • The compute hardware including GPUs
  • The workload and software stack
  • Model operations and tuning
  • Hardware support and warranty

Built on a Bitcoin infrastructure base

We already run dense industrial load around the clock. The same powered facilities and operations carry into high-density compute.

Why it works Northwatt Colocation LLC
Why it worksNorthwatt Colocation LLC
Load
Dense industrial load, run around the clock
Facilities
Energised and built to one written standard
Operations
A team on site, 24/7
Structures

Three ways to work together

We do not sell compute and we do not operate GPUs. What we build with you depends on your scale.

Colocation

Your compute in our facility

For a single deployment. You bring the hardware and run the workload, we provide the space, the power, the cooling and the team on site.

Powered land

Energised land for your build

For larger loads. We provide the industrial land and the power behind it, you build and run what sits on it.

Joint venture

A structure around your requirement

Where neither fits, the structure is built around your load, timeline and term, with the split of responsibilities written down.

In place today

Capacity that already runs

The facilities behind a partnership are energised and carry ASIC load around the clock. They are built and run to one written standard.

The site layerEvery facility
Power
Contracted, on grid as the rule
Cooling
Air-cooled containers, hydro cooled where density calls for it
Connectivity
Fibre with a second path
Access
Fenced, controlled and logged
Operations
A team on site, 24/7
The path

From first call to energised capacity

Five steps, in this order. Nothing is built before the split of responsibilities is in writing.

01

Requirement

You tell us the load, the density per rack, the cooling approach and the timeline. We tell you what fits and what does not.

02

Fit

We match the requirement against the facilities and the power available, and name the gaps rather than smoothing them over.

03

Structure

Colocation, powered land or a joint venture. Responsibilities, term and scope go into the agreement first.

04

Build

We prepare the site layer: power, distribution, cooling, network and access. You prepare the compute.

05

Operate

Our team runs the facility and the power around it. You run the hardware and the workload.

Before the first call

What helps us answer quickly

Bring with you

  • The load you want to run, in kW or MW
  • Density per rack and the cooling it needs
  • Connectivity requirements
  • Timeline and the term you have in mind
  • Who operates the hardware day to day

What we come back with

  • Whether the requirement fits what we run
  • The structure we would propose
  • What is in place and what would need to be built
  • The next step and who owns it
Questions

Partnership FAQ

Question not listed?

Send it through the form. Every message is read and answered by an operator.

Talk to Sales

No. The partner brings and operates the compute hardware. We provide the land, the power and the infrastructure.

No. We are the physical and energy foundation. The compute and the workload sit with the partner.

From colocation for a single deployment to powered land for large buildouts. We match the structure to your load.

Load, term and scope are set per structure and written into the agreement before anything is built.

The partner. Our teams run the facility and the power around it.

We share facility specifics under a mutual non-disclosure agreement.

Yes. Capacity grows in blocks as your requirement grows.

Get in touch

Let's talk capacity.

Tell us your load and your timeline. We will tell you what fits.