Antminer hosting.
Bitmain's Antminer line is the most common hardware in the fleets we talk to. Air-cooled units run in our standard containers, hydro units where density calls for it.
Which container a machine goes into
Air-cooled units run in our standard containers. Hydro-cooled units need a facility with a cooling loop, which is why hydro is confirmed per order.
Air cooled
Standard at every facility. Filtered airflow sized for the draw, containers added block by block.
Hydro cooled
Where density calls for it. Water plates on the machine, a loop in the container, confirmed per order.
Immersion
To be confirmed. Whether and where we take immersion hardware is confirmed per order.
Antminer series and how we host them
Model names are the manufacturer's. Which variants we accept, and in which container, is confirmed in the service order.
| Series | Hosting at Northwatt | Cooling and models |
|---|---|---|
| S21 series | To be confirmed | Air. S21, S21 Pro, S21+ and the S21 XP. |
| S21 Hydro series | To be confirmed | Hydro. S21 Hyd, S21 XP Hyd, S21+ Hyd. |
| S23 series | To be confirmed | Air and hydro. The current generation, including the S23 Hyd. |
| S19 series | To be confirmed | Air. S19, S19j Pro, S19 XP, S19k Pro: the previous generation, widely held. |
What happens when the machines arrive
Every unit is received, inspected and recorded before it is installed.
Receiving
Pallets are counted, serial numbers recorded and damage noted on arrival.
Inspection
Boards, fans or water plates, power supplies and firmware state, unit by unit.
Installation
Racking, cabling and network configuration to the plan in the service order.
Power on
Commissioning and handover. Monitoring is live from the first hash.
Also hosted
Let's talk capacity.
Tell us your hardware and your timeline. We will tell you where it can run.