Avalon hosting.

Canaan's Avalon line is the third major family. Air-cooled units run in our standard containers; hydro and immersion variants are confirmed per order.

Cooling

Which container a machine goes into

Air-cooled units run in our standard containers. Hydro-cooled units need a facility with a cooling loop, which is why hydro is confirmed per order.

Air cooled

Standard at every facility. Filtered airflow sized for the draw, containers added block by block.

Hydro cooled

Where density calls for it. Water plates on the machine, a loop in the container, confirmed per order.

Immersion

To be confirmed. Whether and where we take immersion hardware is confirmed per order.

Model series

Avalon series and how we host them

Model names are the manufacturer's. Which variants we accept, and in which container, is confirmed in the service order.

SeriesHosting at NorthwattCooling and models
A16 seriesTo be confirmedAir. A16 and A16 XP: the current air-cooled generation.
A15 seriesTo be confirmedAir. A15, A15 Pro and A15 XP.
A1566 seriesTo be confirmedHydro and immersion. A1566HA (hydro) and A1566i (immersion).
A14 seriesTo be confirmedAir. The previous generation, still widely held.
Intake

What happens when the machines arrive

Every unit is received, inspected and recorded before it is installed.

01

Receiving

Pallets are counted, serial numbers recorded and damage noted on arrival.

02

Inspection

Boards, fans or water plates, power supplies and firmware state, unit by unit.

03

Installation

Racking, cabling and network configuration to the plan in the service order.

04

Power on

Commissioning and handover. Monitoring is live from the first hash.