Whatsminer hosting.
MicroBT's Whatsminer M series is widely held in Bitcoin fleets. Air-cooled units run in our standard containers; hydro and immersion variants depend on the facility and are confirmed per order.
Which container a machine goes into
Air-cooled units run in our standard containers. Hydro-cooled units need a facility with a cooling loop, which is why hydro is confirmed per order.
Air cooled
Standard at every facility. Filtered airflow sized for the draw, containers added block by block.
Hydro cooled
Where density calls for it. Water plates on the machine, a loop in the container, confirmed per order.
Immersion
To be confirmed. Whether and where we take immersion hardware is confirmed per order.
Whatsminer series and how we host them
Model names are the manufacturer's. Which variants we accept, and in which container, is confirmed in the service order.
| Series | Hosting at Northwatt | Cooling and models |
|---|---|---|
| M70 series | To be confirmed | Air. M70, M70S and M70S+: the current air-cooled generation. |
| M60 series | To be confirmed | Air. M60, M60S, M60S+ and M60S++. |
| M66 series | To be confirmed | Immersion. M66 and M66S, built for immersion tanks. |
| M50 series | To be confirmed | Air. M50, M50S, M50S+ and M50S++: the previous generation. |
| M63 series | To be confirmed | Hydro. M63 and M63S, built for hydro containers. |
What happens when the machines arrive
Every unit is received, inspected and recorded before it is installed.
Receiving
Pallets are counted, serial numbers recorded and damage noted on arrival.
Inspection
Boards, fans or water plates, power supplies and firmware state, unit by unit.
Installation
Racking, cabling and network configuration to the plan in the service order.
Power on
Commissioning and handover. Monitoring is live from the first hash.
Also hosted
Let's talk capacity.
Tell us your hardware and your timeline. We will tell you where it can run.