All posts
Insights
Industry.
Market conditions, workloads and the economics behind a hosting decision, read from the operations side.
Industry
Everything on industry
Industry
Build or host, a line-by-line cost comparison
Every cost line on the build side and the host side, including the ones first estimates leave out, so you can price both routes with your own quotes.
Industry
Hosting economics after a halving
What changes for the fleet owner and what changes for the host, and why the two do not feel the same event at the same time.
Industry
What an AI compute partner needs that an ASIC fleet does not
Density, redundancy, connectivity and contract length compared, so a site owner can see which of the two workloads a location can serve.
Industry
Hashprice explained for hosted mining fleets
What hashprice includes, what it hides, and how to use it when you are deciding between hosting offers rather than trading a position.
Get in touch
Let's talk capacity.
Tell us your hardware and your timeline. We will tell you where it can run.