Power.
Procurement, pricing, curtailment and grid connection: the part of hosting that decides the rate.
Power
Everything on power
Power
Grid connection, the steps and the lead times
From application to energisation, with the stages that dominate the schedule and the ones that only look like they matter.
Power
What an interconnection queue position is worth
How to read a queue position, what can still go wrong after it looks secure, and why a place in the queue is not a date on a calendar.
Power
Underclocking and power tuning, when running slower earns more
How tuning changes the arithmetic between power cost and revenue, when it pays, and what it means for warranty, heat and your hosting contract.
Power
Power purchase agreements for small loads
What is achievable below the scale where power purchase agreements are standard, and which parts of a PPA are worth copying at any size.
Power
Seasonal and daily price shape, why the same rate costs more in winter
Power has a shape across the year and across the day. What that does to an indexed hosting rate, and how to plan production around it.
Power
Demand response programmes, the honest arithmetic
What participation pays, what it costs in lost production, and who keeps the difference when a hosted fleet is the load that stops.
Power
Transmission and distribution charges explained
The part of a power bill that is not energy, why it varies by region, and how it shows up inside a hosting rate you were quoted as one number.
Power
Behind the meter, in front of the meter, and your bill
Why the same megawatt costs different amounts depending on where it sits relative to the meter, and what that means for a hosting rate.
Power
Firm, interruptible and everything in between
Contract types for industrial load, what each one really guarantees, and why the cheapest kilowatt hour is usually the one you can lose.