Insights
Notes from the sites.
What we learn running industrial hosting: power, contracts, cooling and operations. Written for the people who place hardware, not for search engines.
All posts
Everything we have published
Power
What an interconnection queue position is worth
How to read a queue position, what can still go wrong after it looks secure, and why a place in the queue is not a date on a calendar.
Operations
Take-or-pay, when a fixed commitment is cheaper
Why committing to volume can lower a rate, when it does not, and how to size a commitment you can still meet in a bad quarter.
Industry
Hosting economics after a halving
What changes for the fleet owner and what changes for the host, and why the two do not feel the same event at the same time.
Power
Underclocking and power tuning, when running slower earns more
How tuning changes the arithmetic between power cost and revenue, when it pays, and what it means for warranty, heat and your hosting contract.
Operations
Repairs, RMA and the spare parts question
Turnaround times, who pays, and what is worth stocking on site. The part of hosting that decides how much of your fleet is earning next month.
Infrastructure
Fire detection and suppression in container sites
What is required, what is sensible and what insurers ask for in a container deployment, plus the failure modes that start fires.
Power
Power purchase agreements for small loads
What is achievable below the scale where power purchase agreements are standard, and which parts of a PPA are worth copying at any size.
Operations
Who insures your machines
Where a host's liability ends and your own policy begins, which events fall between the two, and what to check in both documents before signing.
Infrastructure
Physical security worth paying for
Fencing, access control, cameras and staffing: what each layer stops, and which combination is proportionate for a container site.
Get in touch
Let's talk capacity.
Tell us your hardware and your timeline. We will tell you where it can run.