Insights
Notes from the sites.
What we learn running industrial hosting: power, contracts, cooling and operations. Written for the people who place hardware, not for search engines.
All posts
Everything we have published
Operations
Hardware liens, what a host can hold and when
A clause to understand before a payment is ever late: when a host can hold hardware, what that requires, and how to keep it narrow.
Power
Seasonal and daily price shape, why the same rate costs more in winter
Power has a shape across the year and across the day. What that does to an indexed hosting rate, and how to plan production around it.
Operations
Firmware, pools and who is allowed to change what
Change control for the things a customer can break remotely: firmware, pool settings, tuning profiles, and who carries the risk of each change.
Industry
What an AI compute partner needs that an ASIC fleet does not
Density, redundancy, connectivity and contract length compared, so a site owner can see which of the two workloads a location can serve.
Infrastructure
ASIC failure rates, building your own baseline
Why there is no single normal failure rate for hashboards, power supplies and fans, how to build one from your own fleet, and when a trend points at the site.
Infrastructure
Immersion, air and the honest comparison
When immersion pays for itself, when it adds problems, and which questions decide the answer before anyone talks about hashrate per rack.
Power
Demand response programmes, the honest arithmetic
What participation pays, what it costs in lost production, and who keeps the difference when a hosted fleet is the load that stops.
Operations
Service levels that mean something
How to read a service level agreement, which remedies are worth having, and how to spot a number that cannot be enforced when it matters.
Infrastructure
Filters, dust and the maintenance nobody budgets for
How dust loads intake filters on an air-cooled site, why pressure drop beats a calendar, and what a skipped change costs in temperature and hardware life.
Get in touch
Let's talk capacity.
Tell us your hardware and your timeline. We will tell you where it can run.